Lifting tape
These surveys are used when the ground is substantially horizontal, open and accessible. The lifting of land with the tape is made by dividing it into triangles, and taking sufficient measures of sides and angles needed to draw and calculate areas.
To establish the positions of points on the ground, draw a figure called polygonal or polygonal base, which continues around the perimeter of the field you wish to raise.
The basic polygon is transformed in a rigid figure dividing it into well-shaped triangles, ie as close as possible to avoid equilateral angles less than 20 °.
Lifting Tape includes two classes of jobs: field and laboratory.
To establish the positions of points on the ground, draw a figure called polygonal or polygonal base, which continues around the perimeter of the field you wish to raise. The basic polygon is transformed in a rigid figure dividing it into well-shaped triangles, ie as close as possible to avoid equilateral angles less than 20 °.
Lifting Tape includes two classes of jobs: field and laboratory.
Fieldwork
This includes the following:
1 .- Recognition land on which to execute the survey, to choose the appropriate method to estimate the time and the people needed, define the vertices of the polygon-based, etc.
2 .- Realization of the vertices of the polygon-based, by means of stakes, markings on rocks or pavement, cards, etc.
3 .- Choice of method to be applied in the survey.
4 .- Draw the sketch of the basic polygon, oriented approximately. 5.-Measurement
side of the base polygon and the auxiliary lines (radiation, diagonal lines, etc.), Used to divide them into triangles the polygon base.
6 .- Measurement of the distances required for the lifting of details regarding the polygon base. Data collected
the removal shall be entered in a clear and orderly in the field notebook.
The record reflects the competitive field of engineering and its value depends largely on the clarity and completeness that was carried.
CABINET WORK means office work management data taken in the field and calculated that they run in order to obtain the information needed to build the plane.
2 .- Realization of the vertices of the polygon-based, by means of stakes, markings on rocks or pavement, cards, etc.
3 .- Choice of method to be applied in the survey.
4 .- Draw the sketch of the basic polygon, oriented approximately. 5.-Measurement
side of the base polygon and the auxiliary lines (radiation, diagonal lines, etc.), Used to divide them into triangles the polygon base.
6 .- Measurement of the distances required for the lifting of details regarding the polygon base. Data collected
the removal shall be entered in a clear and orderly in the field notebook.
The record reflects the competitive field of engineering and its value depends largely on the clarity and completeness that was carried.
CABINET WORK means office work management data taken in the field and calculated that they run in order to obtain the information needed to build the plane.
This work is done in the following order:
1 .- Calculation
a) of the interior angles of polygon based on each one of the inner triangles are calculated using the following formulas:
;;
As a check, the sum of the angles calculated must satisfy the geometric condition:
A + B + C = 180 ° once calculated the interior angles of all triangles that split the polygon base, may be obtained from the interior angles.
b) The surface of the base polygon is found by adding the areas of triangles in which the estate was divided.
The area of \u200b\u200beach triangle is determined by the formula:
In the above formulas a, b, c, are the sides of the triangle p semiperimeter.
2 .- Drawing
Before building the plane is, in some cases, determine the scale used. In other cases the scale, according to the purpose of work, as specified. The scale of a plane is the fixed relationship that all distances in the plane stored with the corresponding distances in the field. Relations can be expressed numerically or graphically.
b) construction of the plane.
Preferably the top of the map should represent the north but raised land form, or direction of any major detail, may require further guidance.
1 .- Calculation
a) of the interior angles of polygon based on each one of the inner triangles are calculated using the following formulas:
;;
As a check, the sum of the angles calculated must satisfy the geometric condition:
A + B + C = 180 ° once calculated the interior angles of all triangles that split the polygon base, may be obtained from the interior angles.
b) The surface of the base polygon is found by adding the areas of triangles in which the estate was divided.
The area of \u200b\u200beach triangle is determined by the formula:
In the above formulas a, b, c, are the sides of the triangle p semiperimeter.
2 .- Drawing
Before building the plane is, in some cases, determine the scale used. In other cases the scale, according to the purpose of work, as specified. The scale of a plane is the fixed relationship that all distances in the plane stored with the corresponding distances in the field. Relations can be expressed numerically or graphically.
b) construction of the plane.
Preferably the top of the map should represent the north but raised land form, or direction of any major detail, may require further guidance.
Plane A title must contain all the information listed below:
. Class background.
. Purpose of the plane, if you have special touches.
. Location of the ground up.
. Name of the plane.
. Scale plane.
. Date.
. Name of the responsible engineer.
data to be shown on topographic maps are
. The length of each side of the polygon.
. The angle between each pair of consecutive sides.
. The area of \u200b\u200bland included.
. The name of the owner of the land and the landowners of the land adjacent to raised.
. The direction of the meridian.
. Scale.
. Symbols.